News | Accident and Emergency
26 May 2017 4:21
NZCity News
NZCity CalculatorReturn to NZCity

  • Start Page
  • Personalise
  • Sport
  • Weather
  • Olympic Games
  • Finance
  • Shopping
  • Jobs
  • Horoscopes
  • Lotto Results
  • Photo Gallery
  • Site Gallery
  • TVNow
  • Dating
  • SearchNZ
  • NZSearch
  • Crime.co.nz
  • RugbyLeague
  • Make Home
  • About NZCity
  • Contact NZCity
  • Your Privacy
  • Advertising
  • Login
  • Join for Free

  •   Home > News > Accident and Emergency

    Picton-to-Grassmere track fixed: KiwiRail

    KiwiRail says it has achieved a key strategic goal with the Picton-to-Grassmere section of the earthquake-damaged Main North Line now repaired.



    KiwiRail says a significant section of the earthquake-damaged Main North Line has been reinstated, with the track from Picton to Grassmere now repaired.

    It also says designs for six bridges along the route, which was hit by the devastating Kaikoura quake in November, are near completion.

    Network services general manager Todd Moyle says more than 100 staff, consultants and contractors had worked up to and through the holiday period.

    They were involved in fixing twisted track, inspecting and redesigning replacement bridges and tunnels, and getting the first part of the line, from Picton south, workable again.

    "A key strategic goal was to get the line to Grassmere completed," Mr Moyle said.

    "While there are no major slips in that area, there were more than 50 medium scale faults on the line and the track had been shifted sideways in many sections along the network."

    He said work began two-and-a-half weeks before Christmas, "so to have it finished by the second week of January is a remarkable feat".

    KiwiRail plans to do a test run from Blenheim to Grassmere on Monday.

    Mr Moyle also said designing a new bridge normally took several months, but the design team already had six ready to go so construction could begin in early February.

    "There is continuing seismic activity in the area and so the safety of our work crews is our No.1 priority," he said.

    "That makes a final completion date difficult to commit to but there is no doubt that, despite the size of the project, we are working to schedule."


    NZN




    © 2017 NZN, NZCity


     Other Accident and Emergency News
     25 May: Stranded Kaikoura locomotive removed
     25 May: Five orca dead in BoP stranding
     25 May: Alarm could have prevented Jubilee sinking
     25 May: One dead in south Auckland crash
     23 May: Manchester attack: Ariana Grande says she is 'broken' after deadly concert blast
     23 May: Manchester Arena 'terror attack' on concert goers an easy target
     23 May: Auckland pedestrian dies from injuries
     Top Stories

    RUGBY RUGBY
    Rebels' Hodge in for Crusaders rugby clash More...


    BUSINESS BUSINESS
    Chorus increases bank facility More...



     Today's News

    International:
    Manchester attack: UK authorities investigating Abedi's possible links to radical Islamist groups 21:57

    Rugby:
    Rebels' Hodge in for Crusaders rugby clash 21:57

    Entertainment:
    Kevin Hart wants to run against Dwayne Johnson at the 2020 US election 21:37

    Rugby League:
    NRL preview panel for round 12 21:17

    Entertainment:
    Nicole Kidman keeps her family and working lives "separate" 21:07

    International:
    How Schapelle Corby the cover girl was born 21:07

    Entertainment:
    Naomi Watts has "good days and bad days" since splitting from Liev Schreiber 20:37

    Entertainment:
    Katy Perry will be paid $25 million to judge 'American Idol' 20:07

    Entertainment:
    Jessica Simpson's husband Eric Johnson has "never" seen her perform 19:37

    Entertainment:
    Kevin Bacon "didn't have enough coke" to pick up women at Studio 54 19:07


     News Search






    Power Search


    © 2017 New Zealand City Ltd